跳到內容

e-REW Express

Date

Description

September 2020

Common Departures for Electric Vehicle (EV) Charging Facilities

July 2020

Common Departures on Tariff Meter Communication (TMC) Infrastructure

March 2020

Common Departures in Design of Grid-connected Renewable Energy Power System (REPS)

December 2019

Common Departures in Design of Interface Parts for Individual Customers

October 2019

Common Departures in Design of Communal Electrical Installations

August 2019

Guidelines and Common Departures of Protection Scheme of LV Main Incomer Directly Fed By Transformer

May 2019

Requirements for Tariff Meter Communication (TMC) Infrastructure Provisions in New Buildings / Existing Buildings with Major Renovation

December 2018

Technical Requirements for Grid-connected Renewable Energy Power System

September 2018

General Requirements of Meter Position, Metering Arrangement, Meter Cubicles and Operation of Meters for Renewable Energy Power Systems

June 2018

Requirements of Fire Resisting Enclosure for HK Electric Service Cutouts and Tariff Meters

March 2018

Common Departures on Electrical Installation Inspection

December 2017

Major Changes in the 6th Edition of 'Guide to Connection of Supply'

October 2017

Highlights of Major Changes in the 6th Edition of 'Guide to Connection of Supply'

August 2017

Safety Measures for Termination of Customer's Single Core Cable to HK Electric Low Voltage Isolator

May 2017

Common Departures for Hawker Stalls

November 2016

Supply Requirements and Common Departures of Customer Installations for Hawker Stalls

March 2016

The Power behind Data Centres

December 2015

"Drive EV Charge Easy" Service: All-round support for Installation of EV Charging Facilities in Private Buildings

October 2015

Requirements for erecting EV Charging Facilities

June 2015

Requirements of Rising Mains Installation

June 2014

Advisory Services on Rewiring Works of Existing Buildings

December 2013

Common Departures on Renewable Energy Power System (REPS) Installation Requirements

July 2013

Harmonic Interferences and its Mitigation Measures

May 2013

Voltage Dips and its Mitigation Measures

February 2013

Supply Interruption and its Mitigation Measures

October 2012

Requirements for 1/F Customer Substation

May 2012

Requirements of Fire Resisting Enclosures for HK Electric Service Cutouts and Tariff Meters

February 2012

Power Suspension Arrangement for Electrical Work

November 2011

Procedures for Request of Access into HK Electrtic Distribution Substation

August 2011

Smart Power Centre

June 2011

Highlights of Major Changes in the 5th Edition of 'Guide to Connection of Supply'

January 2011

Common Departures on Customer Low Voltage Main Switch and Interconnecting Facilities Requirements

October 2010

Common Departures from Metering Installation Requirements

July 2010

Metering Requirements of Current Transformer Operated Meter Installation

April 2010

Metering Requirements of Whole Current Meter Installation

January 2010

Mitigation Measures for Electromagnetic Interference